Timing and planning
Think about furniture six months before you move.
Six months is a safe starting point, especially for a kitchen, several built-ins or a home where installations and other trades need to be coordinated.

A typical planning rhythm.
- 6 months before
First contact and direction
Floor plan, scope, inspiration, budget and an initial layout. A good moment to change installations.
- 4 to 5 months before
Site survey and design
We verify the space and choose appliances, materials, doors, worktops and fittings.
- 2 to 3 months before
Approval and production
Once decisions are final, we reserve materials and a production slot in the workshop.
- Before you move
Installation and handover
The room must be finished, dry and accessible. We agree the exact date well in advance.
Why not wait?
Some doors, fittings and worktops have longer delivery times. The design needs decisions, and the final survey depends on how the renovation progresses.
An early conversation does not mean immediate production. It does help you avoid sockets behind cabinets, badly placed plumbing, doors that cannot open and rushed choices of materials.
Know the month you are moving?
Tell us when you plan to move in and which furniture you need. We will check what schedule is realistic.