How we work

From idea to installation, without guesswork.

Every stage has a clear purpose, and decisions are made before any material goes into production.

Fitting an oak kitchen island with drawers
01

First conversation

We ask about the type of furniture, the room, timing, expectations and a rough budget. You can send a floor plan, photos and inspiration.

02

Site survey

We check walls, angles, levels, installations and potential clashes. For a new house we can start earlier, working from the building plans.

03

Design and decisions

We agree the layout, materials, colours, fittings and appliances, and show solutions that make sense for your budget.

04

Quote and date

You receive a clearly defined scope. Once you accept it, we book production and installation.

05

Production and quality control

We make the components and check how they fit together before heading out to install.

06

Installation and adjustment

We carry everything in, assemble, level and adjust the units. Finally, we check the doors and fittings together with you.

Before the survey and installation

What to prepare so everything runs smoothly.

A production survey is more than width and height. We check plumb lines, levels, angles, slopes, alcoves, installations, obstacles and the route for carrying components in.

01

For the first conversation

Prepare a floor plan or a simple sketch, photos of every wall, some inspiration, a rough budget and your planned moving date.

02

Appliances and needs

Tell us the models of appliances and sanitaryware to be built in. Let us know how many people use the room, what you store and what annoys you about the current layout.

03

Room readiness

For the final survey, walls and plaster should be finished and the floor level known. We need the final positions of water, drains, electrics, gas and ventilation.

04

Access to the area

Move boxes and temporary furniture aside. Make sure we can reach corners, window sills, the ceiling, pipes, radiators, sockets and the full length of every wall.

05

After the survey

Do not move installations, add partitions or thicker wall finishes without checking with us first. Changed dimensions may require design corrections or a new survey.

06

Before installation

The room should be dry, empty and accessible. We need working sockets and a clear route from the entrance to the installation area.

Full pre-survey checklist

Want to know where to start?

Send a floor plan or a few photos. We will tell you whether a consultation comes first or we can book the site survey straight away.

Describe your project